Energy Transportation

How is the planning of the electric power system?


Comprising a structure of 13,516 km of transmission lines - which consists of 18,892km of circuits and 2,280 km of optical fiber cables owned by the Company itself - CTEEP's grid carried 141,161 GWh in 2013, thus interconnecting connection points between generators and other transmission companies, as well as free clients and distributors' grids, which, in turn, carry electric energy to final consumers.

The Company's share in the Interconnected National System (SIN), Brazil's electricity production and transmission system, increased by 2.2% on average between 2009 and 2013.


Share of CTEEP's Load in SIN's Load between 2010-2013 (GWh)












Site Map
Contact Us
Print
your Say
Download
Performance

©Copyright 2014 CTEEP
Company Paulista Electric Energy Transmission

Rua Casa do Ator, 1.155 - 04546-004 - Vila Olimpia
São Paulo - SP - Brazil - Phone: +55 11 3138-7000